Project

abstract-glasslift-1

Case study 5

Working with a major PLC, we designed and installed 2 similar, but different lifts in a major city centre plaza.
abstract-glasslift-3

Case study 4

A typical London terrace with a lightwell between the pavement and the building and the 3 steps from the pavement to the house
abstract-glasslift-2

Case study 3

A 9m lift suitable for disabled access and also occasion's goods within the fabric of an old mill brought many challenges.
abstract-parking-lift

Case study 2

Disabled access lift within a rebuild castle. The brief was to allow access to the upper floor within the confines of a 'empty' turret.
image-left6

Case study 1

Our task was to replace an old and non – compliance lift with an up-to date solution.
We take processes apart, rethink, rebuild, and deliver them back working smarter than ever before.